bulldogface
12-11-2013, 11:38 AM
Hi guys, this might be obvious for most, but anyway..when I am supposed to "link DR1", should I than lift jumper from DR0, thus let be linked only one of them, or should both be linked, other jumper being lifted from PRK? Thanks in advance.