View Single Post
  #2  
Old 10-05-2010, 03:41 PM
Howerton Engineering
Guest
 
Posts: n/a
Default Re: Mounting the FAV

Is the green F-IDC flashing with the FI pulse?

Is the yellow THRES light coming on at all?

Did you put the system in test (SYS jumper) with the jet out of the system to check that everything is operational?

Make sure both grounds from the control board are both grounded well.
Reply With Quote