Re: Just double checking the math....
Sounds good, I think I'll end up running a 1mm and a 0.8mm to see where I'm at, I'm hoping I can trim it down if I need to. Thanks for the info Richard! Now I'm off to the next problem..... Since I just have a MBC and not I'm not using the EBCS, I'm a little confused as to how I would get everything to work together. I'm running 21psi on the pump gas tune and want to run 26psi on the Meth injection. I do not have a MAC valve or any other 3 port BCS. Do I need to have one of these in order to make it work together??
|