View Single Post
  #6  
Old 20-03-2016, 11:45 AM
Richard L Richard L is offline
Manufacturer sponsor
 
Join Date: Oct 2003
Location: England
Posts: 4,936
Default Re: Questions on my direct port meth setup

The ID for a 4mm hose is 2.5mm. Also the volume in the distribution manifold is 2-3cc of fluid and decompression of the pressurised hose. I can see 10cc or more will be seen. Having a inline checkvalve should cut it down by ~80%

The likelihood of an explosion is subject to stoichiometric, not easy to predict the exact amount of air after lift off. It can happen as long as there is fuel left in the manifold.

At what phase does the over-lap blow fuel into the manifold? I was referring to the exhaust stroke. I do think the modern multipoint sequential system inject fuel during this period.

Also, the delay wmi injection on the next event, cavity has to be refilled before reaching the tip of the jets.
__________________
Richard L
aquamist technical support
Reply With Quote