View Single Post
  #12  
Old 30-09-2004, 10:21 AM
TAZ TAZ is offline
Junior Member
 
Join Date: Aug 2004
Posts: 6
Default

Larry,

Managed to get the service bulletin from shurflo for adjusting my pump for up to 100PSI (from the 60).
It describes the procedure to do it....
(if you want it i can sent it via an email....).

Now i'm fixing a distribution manifold to connect the pump, accumulator, solenoid (drives the nozzle system) a preassure gauge, a preassure switch for the manifold and some spare ports for future use.
The order for the ingector nozzle has been set (spraying systems nozzle system) and the steel pipe replacement of the feed to intake manifold is planned to support the nozzle and future additions ... :twisted:

Just an info....
Any schematic for converting my setup with preasure regulator will be much appreciated???
Reply With Quote